Boulder 63rd Street

The project included reconstruction of over a mile of 63rd St in Boulder, CO. Major construction items included 3000 LF of storm sewer, 12" water main, a large triple-cell box culvert, retaining walls, multiple water-quality structures, striping, landscaping, irrigation and complete road reconstruction including curb, walk and asphalt paving. Extensive dewatering was required for the construction of the box culvert and retaining wall.